Say goodbye to 3-week DNO application wait times with Jumptech

For installers, time is money. Waiting weeks for DNO (Distribution Network Operator) approvals and juggling paperwork holds up jobs, costing you valuable opportunities. Every delay means missed installs and frustrated customers.

If you’ve ever been bogged down by DNO applications, stuck between systems, and waiting for weeks, we’ve got great news.

What was the problem?

Historically (because we’ve solved it), managing DNO applications required switching between platforms, manually re-entering data, and waiting for approvals. We listened to your feedback and designed this integration to simplify everything.

What’s new?

With our latest update, we’ve integrated directly with the ENA (Energy Networks Association) portal. This means you can now submit DNO applications faster, without switching between platforms, manually entering data, or chasing approvals.

Jumptech centralises everything in one place, allowing you to process applications in minutes, not weeks. Where installers previously waited 3-4 weeks for approval, applications can now be processed in as little as 30 seconds. This means installations can start faster, reducing downtime and frustration.

How does it work?

A DNO application is required for approval from your local Distribution Network Operator before installing electrical infrastructure, such as EV charging points. This ensures the electricity load on the grid is monitored and safe. Previously, installers—usually senior engineers or electricians—submitted these applications manually, waiting weeks for approval.

Now, with Jumptech’s ENA integration, you can:

• Enter project data once, and Jumptech automatically pulls everything needed into your DNO application, reducing manual errors and saving time.

Monitor the status of applications in real-time, with all related information centralised in one platform.

What This Means for Installers and Customers:

For installers, it means you can take on more jobs, reducing downtime and keeping projects moving. You won’t be stuck waiting for weeks on approvals, which means fewer delays and smoother operations. This also reduces frustration for customers, who are no longer left waiting due to a backlog of DNO applications.

What have we done?

• Integrated with the ENA Connect Direct API to support all EV AC charge points (with solar and more integrations planned in the future).

• Centralised all DNO application details in one place, cutting out the need to jump between systems.

• Added features like error notifications before submission, auto-saving of all details, and pre-population of existing project data to streamline the process.

Ready to get started?

Explore our new ENA integration today, and see how easy DNO applications can be. Faster approvals, less paperwork, and more installations. Your feedback is always welcome!